CR Steel — Structural Steel and Metal Fabrication

GIS
Buildings

GIS housing specialists

We provide robust GIS buildings for gas insulated switchgear installations across the UK energy sector. Designed to house and protect critical electrical equipment, our structures support secure, weather-resistant and accessible environments. Each GIS building can be tailored to project requirements, helping utilities and contractors deliver reliable substation infrastructure.

BS EN 1090

Certified to BS EN 1090-1:2009+A1:2011 Execution Class 3 as per BS EN 1090-2:2018

30+ Years

Years supplying the industry with trusted structural steel fabrication and installation excellence

Workforce

Welding Quality Management System (WQMS) accredited by ISOQAR, approved to BS EN 1090 EXC 3.

UK-Wide

Site erection coverage across the United Kingdom with full project management support

Gas insulated switchgear

GIS buildings engineered around the switchgear.

We provide robust GIS buildings for gas insulated switchgear installations across the UK energy sector — designed to house and protect critical electrical equipment in secure, weather-resistant and accessible environments.

Capability

What we
deliver.

From GIS-supplier footprint co-ordination and EXC 3 frame fabrication through cladding, ventilation and door sub-contracting — every GIS building is engineered, fabricated and delivered by one accountable contractor.

  • Designed around GIS equipment

    Phase 01

    Designed around GIS equipment

    Engineered around the switchgear supplier's footprint, crane beam and lifting loads, cable trenches and earthing routes — co-ordinated against ventilation, fire and seismic specifications.

    • Supplier footprint co-ordinated
    • Crane and lift loads
    • Cable trenches & earthing
    • Fire & seismic aligned
  • EXC 3 structural frame

    Phase 02

    EXC 3 structural frame

    Full structural steel frame fabricated to BS EN 1090-2 Execution Class 3 with coded welders, mill traceability and CE / UKCA marked Declaration of Performance.

    • BS EN 1090-2 EXC 3
    • Coded welders
    • Heat-number traceability
    • CE / UKCA marked
  • Building envelope co-ordinated

    Phase 03

    Building envelope co-ordinated

    Cladding and roof systems, personnel and roller shutter doors, louvres and acoustic ventilation co-ordinated alongside the frame by one accountable contractor.

    • Cladding & roof systems
    • Doors & shutters
    • Acoustic ventilation
    • Louvres
  • Delivered to programme

    Phase 04

    Delivered to programme

    Possession windows respected, with Hiab offload, erection sequencing, method statements and lift plans supplied to site by a single project manager.

    • Possession-window delivery
    • Hiab offload
    • Method statements & lift plans
    • Single project manager
  • ISOQAR ISO 9001 certified
  • Auva ISO accredited
  • UKCA marking
  • Constructionline Silver member
  • Betterweld accredited
  • SAP Ariba supplier

GIS buildings engineered around the switchgear

Our Ethos

  • Designed around GIS equipment

    • Switchgear-supplier footprint co-ordinated
    • Crane beam and lifting loads engineered
    • Cable trenches and earthing accounted for
    • Ventilation, fire and seismic specs aligned
  • EXC 3 structural frame

    • BS EN 1090-2 Execution Class 3 throughout
    • Coded welders to BS EN ISO 9606-1
    • Mill traceability to heat number
    • CE / UKCA marked Declaration of Performance
  • Building envelope co-ordinated

    • Cladding and roof systems coordinated
    • Personnel and roller shutter doors
    • Louvres and acoustic ventilation
    • Single contractor for frame and envelope
  • Delivered to site programme

    • Site possession windows respected
    • Hiab offload and erection sequencing
    • Method statements and lift plans supplied
    • Single project manager to handover

Accreditations

Quality you can
prove anytime.

Every job leaves our facility with full documentation — mill certificates, weld records, inspection reports, CE / UKCA declarations and delivery notes.

  • BS EN 1090 EXC 3
  • BS EN 9606-1 Coded Welders
  • ISOQAR Accredited WQMS
  • UKCA Marking
  • ISO 9001 Quality
  • CE Marked Fabrication

Gas insulated switchgear

Structural steel GIS buildings

Structural steel GIS buildings for gas insulated switchgear installations across the UK energy sector — engineered around the GIS supplier's footprint, crane loads, cable trenches and ventilation requirements, fabricated under BS EN 1090 EXC 3.

Cladding, doors, louvres and roller shutters are co-ordinated alongside the structural frame so the whole building is delivered by one accountable contractor.

Designed to the equipment

Drawings are produced and stamped by our engineering and design team, working from the GIS supplier's GA and electrical layouts.

Full handover documentation

Each GIS building ships with the full compliance pack — DoP, mill certs, weld records and ITP sign-off.

FAQs

GIS buildings
for the UK grid.

Structural steel GIS buildings for gas insulated switchgear installations across the UK energy sector.

  • A weather-tight structural steel building that houses gas insulated switchgear (GIS) equipment, providing controlled environmental conditions, security and protected maintenance access for HV electrical assets.

Ready to build

Tailored, accredited GIS buildings for the UK energy sector — engineered, fabricated and delivered by a single accountable contractor.