CR Steel — Structural Steel and Metal Fabrication

Our
policies.

Governance & compliance

The published company policies underpinning every CR Steel project — audited, current and lived on the shop floor.

BS EN 1090

Certified to BS EN 1090-1:2009+A1:2011 Execution Class 3 as per BS EN 1090-2:2018

30+ Years

Years supplying the industry with trusted structural steel fabrication and installation excellence

Workforce

Welding Quality Management System (WQMS) accredited by ISOQAR, approved to BS EN 1090 EXC 3.

UK-Wide

Site erection coverage across the United Kingdom with full project management support

Company policies

Clear, current policies covering safety, people, data and the environment.

Our policies are maintained to UK regulation — CDM 2015, ISO 9001:2015, UK GDPR and Tier 1 contractor requirements — and available to download below.

  • Policy

    Health and Safety Policy

    CDM 2015 compliant operations across workshop and site — RAMS, coded welders and Constructionline pre-qualification on every project.

  • Policy

    Environmental Policy Statement

    Material traceability, scrap-minimising nesting and energy-efficient UK fabrication supporting grid and renewable energy infrastructure.

  • Policy

    Anti-Slavery Policy

    Our commitment to preventing modern slavery and human trafficking across our operations, workforce and supply chain.

  • Policy

    Code of Conduct

    The standards of behaviour, ethics and integrity expected of everyone working with and on behalf of CR Steel.

  • Policy

    Data Protection Policy (GDPR)

    How we collect, store and protect personal data in line with UK GDPR and the Data Protection Act 2018.

  • Policy

    Equality, Diversity and Inclusion Policy

    Our commitment to a fair, inclusive workplace free from discrimination — for staff, subcontractors and partners.

Capability

What we
deliver.

  • Phase 01

    Engineering and design

    In-house CAD and engineering support — turning architect drawings, engineer mark-ups and concept sketches into fully-detailed, fabricable assemblies ready for the shop floor.

    • Tekla and AutoCAD detailing
    • Engineer mark-up resolution
    • Concept to fabrication drawings
  • Phase 02

    Fabrication and welding

    BS EN 1090-1 EXC 3 fabrication from our Sharnford facility — coded welders, controlled procedures and full mill traceability on every piece that leaves the shop.

    • BS EN 1090 EXC 3 fabrication
    • BS EN 9606-1 coded welders
    • Full mill and weld traceability
  • Phase 03

    Certification and compliance

    CE / UKCA marked steelwork backed by an ISOQAR-accredited quality management system — every job leaves with the documentation principal contractors and grid operators need to sign off.

    • CE / UKCA marking
    • ISO 9001:2015 quality system
    • Full handover documentation pack
  • Phase 04

    UK-wide delivery

    Sequenced UK-wide delivery from our own yard — call-off scheduling, just-in-time loads and site liaison so steel lands when the trades are ready to install it.

    • UK-wide haulage from our yard
    • Phased call-off deliveries
    • Site team liaison to programme

Ready to build

Audited, documented, accountable — on every job.