Programme
Calendar
Programme and delivery planning
Book, reschedule and confirm structural steel delivery slots in real time. Live programme view, automated conflict alerts and delivery windows aligned to cranage availability — eliminating waiting time and unproductive lifts. Every delivery is sequenced to the principal contractor's erection programme and shared across the procurement, project management and site teams.
BS EN 1090
Certified to BS EN 1090-1:2009+A1:2011 Execution Class 3 as per BS EN 1090-2:2018
30+ Years
Years supplying the industry with trusted structural steel fabrication and installation excellence
Workforce
Welding Quality Management System (WQMS) accredited by ISOQAR, approved to BS EN 1090 EXC 3.
UK-Wide
Site erection coverage across the United Kingdom with full project management support
Programme visibility
Live calendar management linking fabrication slots to site delivery dates.
A shared programme view across CAD, fabrication, finishing and delivery — slot every contract, identify clashes early and support the principal contractor's on-programme delivery.
Capability
What we
deliver.
From initial engineering and CAD modelling through coded welding, precision fabrication, surface finishing and tracked UK-wide delivery — each capability is executed by one accredited team with full documentation and traceability on every stage.
Phase 01
Programme view
Single calendar view across every active contract — drag to reschedule, click to confirm, with full audit history.
- Multi-contract overlay
- Drag-to-reschedule
- Click to confirm
- Filter by site or trade
Phase 02
Conflict alerts
Automated notification when fabrication progress threatens a scheduled delivery window — enabling re-sequencing prior to cranage mobilisation.
- Automated notifications
- Re-sequencing prompts
- Cranage-aware
- Programme protected
Phase 03
Cranage-aligned scheduling
Delivery windows are locked to plant hire and shared with the lift supervisor, with automated notification on every schedule adjustment.
- Locked time windows
- Lift-supervisor share
- Auto-notifications
- ICS calendar feed
Phase 04
Phased programme deliveries
Large packages are sequenced into site-friendly drops — eliminating double-handling and on-site storage congestion. Steel arrives in the principal contractor's lift order.
- Site-friendly drops
- Lift-order sequencing
- No double-handling
- Reduced storage congestion
Programme planning, made visible
Our Ethos
Synced to your programme
- Fabrication slots aligned to site dates
- Delivery windows booked against erection
- Holding capacity to absorb programme slips
- Re-sequencing supported without re-pricing
Visible to every stakeholder
- Live calendar shared with main contractor
- Visible to procurement, QA and site teams
- Milestones tracked against contract dates
- Notifications on status changes
Linked to production
- Workshop load board updated in real time
- Material call-offs tied to fabrication start
- Galvanising and paint slots reserved upfront
- Delivery booked when fabrication completes
Records, not memory
- Programme history retained per project
- Slip and recovery actions logged
- Weekly status reports auto-generated
- Audit trail for Tier 1 framework reporting
Accreditations
Quality you can
prove anytime.
Every job leaves our facility with full documentation — mill certificates, weld records, inspection reports, CE / UKCA declarations and delivery notes.
- BS EN 1090 EXC 3
- BS EN 9606-1 Coded Welders
- ISOQAR Accredited WQMS
- UKCA Marking
- ISO 9001 Quality
- CE Marked Fabrication
More Steel SAAS
Explore related steel saas.
Each platform tool is built to run alongside your fabrication workflow — from live pricing and AI analysis through project management and delivery tracking. Explore the features that digitise your steel operation end-to-end.
Client portal
Project Manage
Tenders, line items, supplier POs, goods-in, certificates and production stages — one connected workspace for steel procurement.
Drawings to take-off
AI Steel Analyse
Upload plans, drawings or DSTV NC files — our AI extracts quantities, sizes and lengths instantly and answers questions in plain English.

Accreditations
CE & ISO Fabrication
Fully accredited fabrication you can trust — every project delivered to BS EN 1090 standards with full traceability and documentation.

Nationwide logistics
UK Steel Delivery
Coordinated UK-wide deliveries with Hiab offload, phased site drops and signed documentation on every load.
Programme planning
Delivery slot management for structural steel projects
Calendar Manager gives buyers, project managers and site teams a single shared view of every structural steel delivery across every active job. Drag to move a slot, click to confirm, and watch the change propagate to the lift supervisor and the workshop in real time.
Slot windows can be locked to match crane hire or MEWP availability, so steel arrives in the order it's erected — not the order it was fabricated. The result is fewer empty hooks, fewer on-site storage clashes and a cleaner programme.
Tied to live production
Conflict alerts fire the moment a workshop slip threatens your delivery window. Combined with our project management workflow, you see the impact on programme before it becomes a problem on site.
Phased to your erection sequence
Large packages are broken down into site-friendly drops and routed through our UK steel delivery network — no double-handling, no surprise pallets, just the steel you need in the order you need it.
FAQs
Steel delivery
scheduling, sorted.
How our calendar manager keeps steel delivery slots, crane hire and erection programmes in sync across every active project.
- A steel delivery calendar manager is a programme-aware scheduling tool that lets contractors book, move and confirm structural steel delivery slots in seconds — across every active project — and warns the moment a workshop slip threatens an agreed delivery window.
Ready to build





