CR Steel — Structural Steel and Metal Fabrication

STEEL
CONSTRUCTION

Erection · Site installation · Handover

UK-wide structural steel erection and on-site installation. CSCS-carded erection teams, mobile crane and MEWP co-ordination, documented lift plans, project-specific RAMS and on-site coded welding — delivered by the same accountable contractor that fabricated the steel package.

BS EN 1090

Certified to BS EN 1090-1:2009+A1:2011 Execution Class 3 as per BS EN 1090-2:2018

30+ Years

Years supplying the industry with trusted structural steel fabrication and installation excellence

Workforce

Welding Quality Management System (WQMS) accredited by ISOQAR, approved to BS EN 1090 EXC 3.

UK-Wide

Site erection coverage across the United Kingdom with full project management support

STEEL CONSTRUCTION

Steel erection and on-site installation, delivered by a single accountable contractor.

From site set-up and crane positioning through to final bolting and handover, our steel frame erection service is built around programme certainty and safe co-ordination on live sites.

We plan every lift with appointed-person sign-off, crane-rated lift plans and ground-bearing assessments issued in advance. MEWPs, telehandlers and mobile cranes are co-ordinated through a single point of contact so steel arrives, lifts and lands in the right sequence.

Dedicated project managers track deliveries, labour and progress against the master programme, with daily briefings, toolbox talks and site-specific RAMS keeping safety at the forefront. CDM compliance, CSCS-carded operatives and documented lift practices mean work proceeds efficiently and on time — with one contractor accountable from fabrication to handover.

Capability

What we
deliver.

From CSCS-carded erection crews and crane lift planning through on-site coded welding and project-specific RAMS — every phase is executed by the same accountable contractor that fabricated the steel, eliminating interface risk on site.

  • Phase 01

    Steel erection

    Site-installation crews with full PPE, harnesses and CSCS / IPAF / PASMA accreditation as the project specification requires.

    • CSCS-carded crews
    • Slinger / signaller
    • Method-statement led
    • Programme-driven
  • Phase 02

    Lift planning

    Crane selection, lift plans and ground-bearing assessments produced in-house and issued to the principal contractor for sign-off.

    • Crane-rated lift plans
    • Site access reviewed
    • Appointed Person sign-off
    • Sequenced to programme
  • Phase 03

    Site welding

    Coded MIG / TIG / MMA welders provided for on-site connections, modifications and remedial works.

    • Coded site welders
    • WPS controlled
    • NDT where specified
    • Weather-protected
  • Phase 04

    Health and safety

    Project-specific RAMS, daily briefings and formal near-miss reporting integrated with the principal contractor's safety system.

    • RAMS per package
    • CDM compliant
    • CSCS-carded operatives
    • Toolbox talks
  • ISOQAR ISO 9001 certified
  • Auva ISO accredited
  • UKCA marking
  • Constructionline Silver member
  • Betterweld accredited
  • SAP Ariba supplier

How we work alongside construction

Our Ethos

  • Site-led programming

    • Fabrication sequenced to your erection plan
    • Phased deliveries to suit crane availability
    • Liaison with site manager from day one
    • Adjustment to construction programme changes
  • Construction-grade paperwork

    • RAMS for delivery and offload activity
    • Lift plans and bolt torque method statements
    • CE / UKCA documents accepted by Building Control
    • O&M-ready handover dossier
  • Deliveries built for site

    • Hiab-equipped deliveries for self-offload
    • Loads sequenced and labelled for erection
    • Just-in-time scheduling to avoid lay-down
    • Direct call-off arrangements supported
  • Safety alignment

    • CSCS-carded operatives on every site visit
    • Method statements aligned to principal contractor
    • PPE and welfare arrangements pre-agreed
    • Toolbox talks delivered where required

Accreditations

Quality you can
prove anytime.

Every job leaves our facility with full documentation — mill certificates, weld records, inspection reports, CE / UKCA declarations and delivery notes.

  • BS EN 1090 EXC 3
  • BS EN 9606-1 Coded Welders
  • ISOQAR Accredited WQMS
  • UKCA Marking
  • ISO 9001 Quality
  • CE Marked Fabrication

More Services

Explore related services.

Site erection is the visible end of an integrated chain — engineering, fabrication, welding and logistics all converge on the build. Explore the upstream services that make our crews productive from day one on site.

Site installation

Structural steel erection and site installation

We erect the structural steel we fabricate. CSCS-carded teams, planned lifts, on-site coded welding and project-specific RAMS — delivered by the same accountable business that ran the drawings and the workshop.

When the people who fabricated the steel also install it, snags are fixed on the spot. No finger-pointing between fabricator and installer, no second mobilisation to put right what could have been adjusted on the day.

Lift plans and crane coordination

Lift plans, ground-bearing assessments and crane selection are produced in-house and aligned to your delivery slots so the steel and the crane meet on time.

On-site coded welding

Site connections and modifications are made by the same coded welders who run the workshop, to the same procedures and the same paperwork.

FAQs

Steel construction,
answered.

Structural steel erection and on-site installation by the same accredited contractor that fabricated the package — UK-wide, with documented lift planning and on-site coded welding.

  • Yes. The same accredited contractor fabricates the structural steel and installs it on site — eliminating the contractual interface between fabricator and erector that typically delays close-out and snagging on UK construction projects.

Ready to build

Fabricated and erected by a single accountable contractor — UK-wide, signed off on site to the principal contractor's QA plan.