CR Steel — Structural Steel and Metal Fabrication

Rail
Steel

Stations, platforms and lineside

Specialist steel fabrication for the UK rail industry — platform canopies, station buildings, footbridges, lineside support structures, depot facilities and equipment housings, fabricated to suit rail-industry standards.

BS EN 1090

Certified to BS EN 1090-1:2009+A1:2011 Execution Class 3 as per BS EN 1090-2:2018

30+ Years

Years supplying the industry with trusted structural steel fabrication and installation excellence

Workforce

Welding Quality Management System (WQMS) accredited by ISOQAR, approved to BS EN 1090 EXC 3.

UK-Wide

Site erection coverage across the United Kingdom with full project management support

Rail Steel steel specialists

One accredited UK team delivering rail steel steelwork end-to-end.

Engineering, fabrication, CE / UKCA certification and UK-wide delivery for rail steel projects — one project manager, one accountable workflow, full traceability on paper.

Capability

What we
deliver.

From OLE support steel and station canopies through trackside walkways and possession-aligned site drops — every rail fabrication is delivered to Network Rail specs, hot-dip galvanised and tracked to the possession plan.

  • Stations, platforms and canopies

    Phase 01

    Stations, platforms and canopies

    Steel for new and refurbished station buildings, platform canopies and concourse structures — fabricated under controlled, certified conditions with finishes selected for high-passenger environments.

    • Platform canopies and shelters
    • Concourse and station frames
    • Cladding and finish support steel
  • Footbridges and access structures

    Phase 02

    Footbridges and access structures

    Pedestrian rail footbridges, step and lift towers, access stairs and walkways — engineered for span, accessibility and minimum possession-time on site.

    • Pedestrian rail footbridges
    • Step and lift towers
    • Access stairs and walkways
  • Lineside, depots and equipment housings

    Phase 03

    Lineside, depots and equipment housings

    Lineside support structures, signalling equipment housings, REB bases, depot buildings and maintenance facilities — galvanised, CE / UKCA marked and built around rail-industry specifications.

    • Signalling and REB support steel
    • Lineside equipment frames
    • Depot and maintenance buildings
  • Possession-ready fabrication

    Phase 04

    Possession-ready fabrication

    Pre-assembled, pre-finished modules engineered to land inside short possessions — full lift plans, trial assemblies and method statements provided as standard.

    • Pre-assembled modules for short possessions
    • Trial assembly and lift plans
    • RISQS-aligned documentation
  • ISOQAR ISO 9001 certified
  • Auva ISO accredited
  • UKCA marking
  • Constructionline Silver member
  • Betterweld accredited
  • SAP Ariba supplier

Accreditations

Quality you can
prove anytime.

Every job leaves our facility with full documentation — mill certificates, weld records, inspection reports, CE / UKCA declarations and delivery notes.

  • BS EN 1090 EXC 3
  • BS EN 9606-1 Coded Welders
  • ISOQAR Accredited WQMS
  • UKCA Marking
  • ISO 9001 Quality
  • CE Marked Fabrication

More Sectors

Explore related sectors.

Rail steel sits alongside our infrastructure, energy and industrial work — all engineered to possession-window delivery slots. Explore the related sectors that share our heavy fabrication, coded welding and compliance reporting.

FAQs

Rail Steel steel,
answered.

Structural steel and metal fabrication for rail steel — specification, certification, programme and UK-wide delivery.

  • Specialist steel fabrication for the UK rail industry — platform canopies, station buildings, footbridges, lineside support structures, depot facilities and equipment housings, fabricated to suit rail-industry standards. Typical scope includes platform canopies and station buildings, rail footbridges and walkways and the supporting secondary steelwork — designed, fabricated and CE / UKCA marked under one accredited UK contractor.

Ready to build

Rail steelwork fabricated to standard, with the certification, traceability and finishes the network demands.